HISTORY OF CHANGES

Year

What was Changed

2002-2003
  • New Groomer
  • Black Diamond graded
2000-2001
  • New mighty-mite pole barn built and painted
  • I89 starting shed painted
  • Ski Lodge outer wall painting completed
  • Timing system tested and troubleshooted
1999 - 2000
  • Built a start shack on the race start at the top of I89.
  • Rewired the new timing system and suspend it (along with the safety circuits) along the towers of the T-bar.
  • Built a new training start at the top of the Race trail.
  • Upgrade the Ski Lodge entry area.
  • Upgrade the Septic tank and bathroom accommodations
  • Install new electrical power to Ski Lodge
  • New Voice Mail Phone messaging to existing Phone line
1998  - 1999
  • Snow making upgrades
  • Brush and tree removal from Lift Lines
  • Rewire T-Bar and Racing Equipment
  • Lodge Entrance & Organization
  • Run power to the Mighty Mite
  • Resurfacing the parking lot