Year
|
What was Changed
|
| 2002-2003 |
- New Groomer
- Black Diamond graded
|
| 2000-2001 |
- New mighty-mite pole barn built and painted
- I89 starting shed painted
- Ski Lodge outer wall painting completed
- Timing system tested and troubleshooted
|
| 1999 - 2000 |
- Built a start shack on the race start at the top of I89.
- Rewired the new timing system and suspend it (along with the safety circuits) along the
towers of the T-bar.
- Built a new training start at the top of the Race trail.
- Upgrade the Ski Lodge entry area.
- Upgrade the Septic tank and bathroom accommodations
- Install new electrical power to Ski Lodge
- New Voice Mail Phone messaging to existing Phone line
|
| 1998 - 1999 |
- Snow making upgrades
- Brush and tree removal from Lift Lines
- Rewire T-Bar and Racing Equipment
- Lodge Entrance & Organization
- Run power to the Mighty Mite
- Resurfacing the parking lot
|